Aportus Cold Storage

A cold storage warehouse project including tilt-wall panels, slab on grade, concrete paving and earthwork. We have completed over 10 warehouses with Zuko Construction, providing turn-key solutions within budget and on time, every time.

Scope of Work

  • 10,675 sf - Slab on Grade & Spread Footing Foundation
  • Freezer Slab
  • (1) Truck Ramps
  • Cast-in-Place Stairs
  • Casting Beds for Tilt Wall Panels
  • 14,200 sf - Concrete Tilt Wall Panels - Panel Shop Drawings w/Casting Layout
  • Panel Erection - Crane Rental
  • Concrete Pumping
  • Light Pole Bases, Transformer & Generator Pad
  • 2,150 sf - Sidewalks
  • Dumpster Pad Foundation
  • 49,000 sf - Concrete Paving
  • 8,600 sf - Asphalt Paving & Caliche
  • Paving Sub grade Prep - Lime Treated
  • Building Pad Excavation & Fill
  • Initial Site Clear & Grub, Site Balance & Rough Grading
  • Detention Pond Excavation
  • Parking Lot Striping Package
  • Erosion Control

  • Client:

    Zuko Construction

  • Location:

    Pharr, Texas

  • Project Size:

    10,500sf